The re-start of the elevator is still not scheduled. We have been delayed by faults discovered in the original wiring of the fire alarm system during testing. Our contractor has …
The best of condo living in Calgary
The re-start of the elevator is still not scheduled. We have been delayed by faults discovered in the original wiring of the fire alarm system during testing. Our contractor has …
We have noticed that some KOP residents have been using hand-made parking passes for their visitors’ vehicles. This is a reminder that every KOP resident is allocated a laminated pass …
Today, on Wednesday Sept. 9, our electrical contractor is conducting a battery test on the new fire alarm control system that was installed as part of the elevator rebuild. For …
The new fire alarm system is now functioning. We no longer need fire watch patrols. Thanks to those who volunteered on this. The alarm system requires a formal inspection and …
The combination lock on the garbage room door is not functioning. Until this is fixed the door will not open. We have a locksmith scheduled to repair this lock this …
The fire alarm system is now disabled and will be so until the new fire alarm panel is installed and tested either Wednesday or Thursday next week (Sept. 3 or …
The elevator completion date has now shifted into September. It looks like the earliest we can plan for is September 15, and that date may still shift again. We are …
In the latest update re our elevator work, our contractors are estimating the elevator will be back in service at the end of August. The contractors are not able to …
Kensington on the Park is currently experiencing an issue with the Chubb Security System. There is an alarm going off in the parkade and the rear outside door key fob …
The planned power outage at KOP was completed today by 10AM today. This outage did not affect all suites, so it is possible your unit did not have its power …